<< Click to Display Table of Contents >> Navigation: Embroidery Input/Output > Production Time Estimate |
This feature produces a production time estimate.
You can execute this function from the menu FILE > Information. |
The production time is based on:
•The number of pieces of the job order
•Design characteristics: stitch count, color count, trim count, length of stitches, etc.
•Machine features: heads, needles per head, speed chart, color change time, thread trim time, etc.
•Operator time: hooping time, bobbin change time, etc.
The more accurate you can specify these parameters, the more accurate the estimation is. You can use any of the pre-defined machines or you can create your own machine and set the machine parameters. Default values on the pre-defined machines are statistical values.
To get a quick initial time estimation: ➢Type the number of pieces to produce ➢Select a machine from the list. The estimate is computed almost instantly.
You will get a time usage graph with dividers for the main events and a job summary, with run count, average speed, etc. |
You can edit some basic characteristics of the machine to consider. |
➢Click on the Print button (located at the bottom left corner of the window) the production time estimation report.
Software Level (Perpetual License) |
Included |
Available (extra feature) in |
|
---|---|---|---|
|
SE-10 Edit (Essentials) |
Option |
Embroidery Order Time & Quote |
|
SE-20 Convert (Lite) |
Option |
Embroidery Order Time & Quote |
|
SE-30 Create (Liberty) |
Option |
Embroidery Order Time & Quote |
Software Level (Subscription) |
Included |
Available (extra feature) in |
|
---|---|---|---|
|
SEU Express |
No |
|
|
SEU Standard |
No |
|
|
SEU Liberty |
Option |
Embroidery Order Time & Quote |